Construction of Bereket-Etrek Railway Project (Tranche 2)

Brief Summary
The project is a part of the main project of 936 km long North_South railway corridor linking Kazakhstan, Turkmenistan and Iran. Railway tracks of 724 km long will be constructed inside Turkmenistan. The Northern section of 467 km long railway track isbeing constructed by the Government from its own sources. The remaining section (Southern) of 257 km railway tracks with 69 km auxiliary lines will jointly be covered by IDB financing and the Government.
Location
Sector
نقل
Project cost
$197146554
Project Status
نشيط
تاريخ البداية.
4 يناير 2010
تاريخ النهاية.
25 يونيو 2019